About the Installation

Discover this well engineered, turnkey, commercial solar and BESS solution which includes the construction of Solar Carports. With increasing electricity tariffs, high cost of running diesel generators and unreliable power supply this medical facility has decided to take a step towards a greener and more reliable future. Not only are they benefiting from solar PV generation, but the installed system provides them with an additional source of reliable power.

Design and Construction

The medical facility required a robust and continuous power supply to ensure the uninterrupted operation of essential medical equipment and services. e-LEK Energy’s team of engineers designed this system to maximize the solar PV potential for this facility. This included the design, supply, and construction of solar carports, which not only provide shade but also harness solar energy efficiently.

Due to the nature of operations at the medical facility, uninterrupted power supply is of the utmost importance. This solution is integrated with the existing generator and emergency generator, providing an additional layer of power security.

hotel

Equipment Installed

The system consists of the following:

 

  • 145kWp Solar PV Panels
  • 200kW Inverter Capacity
  • 386kWh Battery Capacity
  • 200kVA Generator Integration
hotel

Monitoring and Maintenance

e-LEK provides daily monitoring and maintenance services to the facility to ensure that the system is performing optimally.